Choose dimensions before you write

Settle the grid, the core section and the tenancy depth first, then write the spaces. Do it the other way round and check will pass something that is not a building.

This page is not koyu semantics. The numbers below are design knowledge, taken from real product catalogues and from Japanese design practice. They are not rules of the notation and not guarantees of the implementation. koyu check protects consistency and says nothing about whether a dimension is realistic — a 2m-wide lift and a 30m-deep tenancy both come out green. If you design against a different set of conventions, replace this whole table.

The order

  1. Pick the grid. For offices and retail, 8,400 is the default.
  2. Lay out the core section. Read it as three bands: shaft 2,400 + service zone 1,800 + lift lobby 4,200.
  3. Settle the tenancy depth. Core to window, 8.4–12.6m.
  4. Settle the storey height. A typical office floor is 4,200 = ceiling 2,800 + service void 1,400.
  5. Only now write space.

Structural grid

ItemValueWhy
Basic bay, office and retail8,400the modal bay in large Japanese offices (the middle of 6.4–9.6m); also divides into three 2,800 parking bays
Long span (banqueting, column-free)16,800–25,200two or three basic bays keeps the beam depth realistic
Column size1,000 low, tapering to 700 square highnarrowed as the building rises

The bundled examples/twin/ sits entirely on an 8,400 grid.

Vertical circulation

ItemValueWhy
1600kg lift car2,150W × 1,600Dthe standard size of a real passenger machine
Its shaft, one car2,800W × 2,400Dcar + counterweight + structural tolerance
Three side by side = 8,400 = one bay2,800 × 3the traffic calculation lands straight on the grid
Lift lobby, facing banks4,200 widea single bank wants 2,700–3,500
Service band behind the shafts1,800holds the electrical, plumbing and duct risers
Rule of thumb for car countoffice 3,000–4,000 m²/car, hotel 100 rooms/carstarting values for traffic analysis
Escalator1,200 wide; length ≈ storey height × √3 (12,000 for a 6,900 storey)30° pitch; add 2,000 at each landing
Vehicle ramp6,000 wide for two-way, up to 1:6a 4,200 rise wants 25,200 of run — three bays

Write one shaft per car, one car per space. Bundle them and the plan loses what a lift room actually is.

The size of the stair enclosure decides the step

You do not write riser counts or treads. You write the size of the enclosure, and koyu runs derives the step from it. The tread is derived towards a target of 300mm, and the landing absorbs whatever is left over. Too short an enclosure never reaches the target, and the tread starves.

For a 4,200 rise in a 2,800-wide return stair, varying only the depth in the direction of climb:

4000	L1→L2	stair	S	rise 4200mm	return	24 risers of 175mm, tread 164mm	going 3600mm	/L1/s
4600	L1→L2	stair	S	rise 4200mm	return	24 risers of 175mm, tread 218mm	going 4800mm	/L1/s
5000	L1→L2	stair	S	rise 4200mm	return	24 risers of 175mm, tread 255mm	going 5600mm	/L1/s
5600	L1→L2	stair	S	rise 4200mm	return	24 risers of 175mm, tread 300mm	going 6600mm	/L1/s
6000	L1→L2	stair	S	rise 4200mm	return	24 risers of 175mm, tread 300mm	going 6600mm	/L1/s
7000	L1→L2	stair	S	rise 4200mm	return	24 risers of 175mm, tread 300mm	going 6600mm	/L1/s

koyu validate flags a cramped step as stair.proportion (a caution). Of those six, 4,000 and 4,600 are caught; 5,000 and above pass.

⚠ [stair.proportion] s4000.muro:line 11: Derived step dimensions are cramped: 24 risers of 175mm, tread 164mm (2*riser+tread = 514mm; expected 550-700mm)
⚠ [stair.proportion] s4600.muro:line 11: Derived step dimensions are cramped: 24 risers of 175mm, tread 218mm (2*riser+tread = 568mm; expected 550-700mm)

A taller storey needs a deeper enclosure. Keep the width at 2,800 and raise the storey to 6,900 — a ground-floor entrance — and 7,000 of depth is what it takes to reach a 253mm tread.

L1→L2	stair	S	rise 6900mm	return	39 risers of 177mm, tread 253mm	going 9600mm	/L1/s

2,800 × 7,000 is the workable block for a protected escape stair — the stairs in examples/twin/core.muro are written at exactly that size.

Section (storey heights)

ItemStorey heightMade of
Typical office floor4,200ceiling 2,800 + service void 1,400 (write slab:1400)
Retail4,800–6,900ceiling from 3,000; the ground-floor entrance at 6,900 (ceiling 6,000)
Hotel room, dwelling3,200–4,200keep 4,200 if it shares a slab with offices
Plant floor4,600–6,000the installation height of the machinery. It does not appear in the storey numbering the public sees — name them M1, M2
Basement car park3,300 (2,300+ under the beams)slab:900

koyu levels prints the stack of storey heights as a section. If ceiling plus the slab above exceeds the storey height, check stops you.

Grain of the plan

ItemValueWhy
Office tenancy depth, core to window8.4–12.6mstandard is 9–13m; past 18m both the workplace and the structure fall apart
Hotel room4,200 wide × 8,400 deep ≈ 35 m²width = half a bay divides cleanly
Apartment8,400 wide (one bay) × 10–12m deepa 70–90 m² family unit
Double-loaded corridor2,4002,400–4,200 inside an office core
Retail mall8,400 wide including the voidwalking zone on both sides plus dwell space
Toilet blockhalf a bay (4,200 × 8,400); one bay for both sexesstandard on a typical office floor

Deep floor plates fail on daylight

One-seventh is a ratio of areas, so past a certain depth no amount of glazing reaches it. Put a single 5,600 × 2,600 curtain wall panel into an 8,400-wide plate and vary only the depth — 10.2m and 16.8m — then run koyu light:

✔ /L1/shallow	Depth-10200	window 14.56 m2 / floor 85.68 m2 = 1/5.9 (needs 1/7 ≈ 12.24 m2)
✖ /L1/deep	Depth-16800	window 14.56 m2 / floor 141.12 m2 = 1/9.7 (needs 1/7 ≈ 20.16 m2)
✖ Short of 1/7: 1 of 2 rooms (this is a validation judgement)

Do the window arithmetic before you commit to the unit layout. A zone that cannot make it is a candidate for a lounge or a store rather than a dwelling. The procedure is in Open windows and pass the daylight check.

Envelope

ItemValue
Curtain wallone bay wide (8,400) × full storey height as a window says "that face is glass"
Grand entrancetwo four-leaf automatic doors = 7,200 × 5,000
Dwelling sliding door5,600 × 2,600 with sill:200
Parapet and balustradeh:1200 with air:1 — the edge of a terrace or roof garden

The edge carrying air:1 is what makes the space semi-outdoor. The daylight coefficient and the outdoor test both follow from it.

What the rentable ratio really is

  • A single-use office typical floor runs 70–80% rentable. Across the whole building it falls to 60–70% — the ground-floor lobby and the plant floors eat it.
  • A large mixed-use scheme falls further. The bundled examples/twin/ measures as follows: against 141,448.56 m² of floor area, rentable plus exclusive is 46.8%, and 52.2% of the above-ground part once the car park is set aside.
$ npx tsx src/cli.ts stats examples/twin/main.muro
Total 141448.56 m2 (indoor floor area)
Outdoor 24911.04 m2 (plazas, open ground and the like — not counted as floor area)
Semi-outdoor 6534.08 m2 (balconies, external stairs and the like — whether they count is a matter of regulatory detail, so it is reported separately)
By use: common 60487.47 m2 (42.8%) / parking 14868.00 m2 (10.5%) / rentable 63462.21 m2 (44.9%) / exclusive 2630.88 m2 (1.9%)

That is an honest number with two cores, two plant floors, a hall, banqueting and planted roof terraces all piled into common.

$ npx tsx src/cli.ts site examples/twin/main.muro
Site /site (敷地)
  Site shape: polygon with 14 vertices (a polygon declaration — given geometry)
  Site area: declared 23167.40 m2 / derived 23167.40 m2
  Road: /road-s (南側道路) width 25000mm / frontage 168000mm
  Road: /road-e (東側道路) width 18000mm / frontage 151200mm
  Road: /road-n (北側道路) width 16000mm / frontage 168000mm
  Building footprint (horizontal projection, rough): 9596.16 m2 → building coverage ratio 41.4%
  Total floor area: 141448.56 m2 → floor area ratio 610.5%

To raise the rentable ratio, narrow the core — do not deepen the plate. Depth only adds floor without a window.